2006ID: SL-EXT-2006-003 (SL-P80 / SL-P86 / SL-P92)

Upper Kotmale Hydroelectric Power Project (150MW)

ඉහළ කොත්මලේ ජල විදුලි බලාගාර ව්‍යාපෘතිය (මෙගාවොට් 150)

RESTRUCTURED

Official Agreement: Japan International Cooperation Agency (JICA) Official Development Assistance Loan

Original Principal$325 MJPY 37,817,000,000
Current Outstanding$215 MRs. 64,930 M
Principal Repaid$110 MInterest Paid: $24.5M
Interest Rate0.75%FIXED (0.75% Fixed JICA Concessional ODA Yen Loan Terms (Tied to environment & engineering))

Why Was This Loan Taken? Officially Stated Purpose

Construction of 150MW run-of-the-river hydroelectric power plant, 12.8km underground headrace tunnel, and transmission link.

මෙගාවොට් 150 ක ධාරිතාවයෙන් යුත් ජල විදුලි බලාගාරයක් සහ කිලෝමීටර් 12.8 ක භූගත උමං මාර්ගයක් ඉදිකිරීම.

Responsible MinistryMinistry of Power & Energy
Implementing AgencyCeylon Electricity Board (CEB)
Project Site / ScopeTalawakele, Nuwara Eliya District

Full Contractual Terms & Financing Conditions

CreditorJapan International Cooperation Agency (JICA) / JBICJapan
Borrower EntityGovernment of Sri Lanka / Ceylon Electricity Board (CEB)CENTRAL_GOVERNMENT
Signing Date2006-03-31Effective: 2006-06-20
Final Maturity2042-03-31Original: 2036-03-31
Interest Rate0.75% (FIXED)Fixed Coupon
Grace Period10 YearsPrincipal moratorium
Repayment FrequencySEMI_ANNUALEQUAL PRINCIPAL
Commitment Fee0.1%On undisbursed balance
CONTRACTUAL TIMELINE

Loan Duration & Repayment Schedule Architecture

Total Tenure: 40 Years
1
Agreement Signing2006-03-31Year: 2006
2
Grace Period Moratorium10 YearsInterest only (No principal due)
3
Principal Repayment Starts2016-06-30Frequency: SEMI_ANNUAL
4
Final Maturity2042-03-315690 Days Remaining
Amortization Method: EQUAL PRINCIPAL
Repayment Window: 30 Years

2024 Sovereign Debt Restructuring Treatment

OFFICIAL_CREDITOR_MOU
Original Contract Terms (Pre-Restructuring)

Concessional 40-year Yen loan at 0.75% maturing 2036.

Original Maturity: 2036-03-31
Post-Restructuring Terms (2024 Agreement)

Included in Paris Club / OCC restructuring framework with extended grace and final maturity extended to 2042 at concessional rates.

New Maturity: 2042-03-31
Treatment: MATURITY_EXTENSION (0% Haircut)

Government in Office & Political Context When Signed

President / Head of StateMahinda Rajapaksaමහින්ද රාජපක්ෂ
Prime MinisterRatnasiri Wickremanayake
Finance MinisterMahinda Rajapaksaමහින්ද රාජපක්ෂ
Constitutional Record: This loan was executed under the official mandate of the Mahinda Rajapaksa Administration. The sovereign obligor is the Democratic Socialist Republic of Sri Lanka.

Auditor General Official Record

Auditor General Special Report on Resettlement and Environmental Compensation for Upper Kotmale (2012)

Additional compensation disputes and landslide mitigation engineering revisions increased civil works cost by Rs. 3.2 Billion.

Financial Impact Noted: Rs. 3,200 Million
Status: RESOLVED

Cabinet & Parliament Approvals

Cabinet Paper: CP/06/0340/12 (2006-02-15)

Approved JICA Yen loan agreement for Upper Kotmale Hydroelectric Project.

Parliamentary Hansard / Act: Special Loan Agreement Approval with Japan International Cooperation Agency

Approved under Appropriation Act limits

Payment-level contract amortization schedule not publicly disclosed by creditor.

Aggregate annual repayments and outstanding balances are reported under CBSL Public Debt Bulletin.

Verified Document Library & Primary Sources

Tier: PRIMARY_OFFICIAL
Central Bank of Sri Lanka Annual Report 2025 (Public Debt Operations)Central Bank of Sri Lanka (CBSL) | Published: 2026-04-30
Verify Source
Department of External Resources (ERD) Foreign Financing Performance Report 2025Department of External Resources, Ministry of Finance | Published: 2026-03-31
Verify Source
Official Creditor Committee (OCC) Memorandum of Understanding on Debt RestructuringOfficial Creditor Committee (Co-chaired by Japan, India & France) | Published: 2024-06-26
Verify Source